Hardworking and simple, and get to the bottom.

Discount wholesale Plc Controller Led Display - SCP type construction lift platform – Jinyang

Short Description:


Product Detail

Quality guarantee

Product Tags

Related Video

Feedback (2)

With our rich experience and considerate services, we have been recognized as a reliable supplier for many international buyers for Gearbox Motor Rubber Coupling , Hoist Reducer , Wind Speed Meter , "Quality", "honesty" and "service" is our principle. Our loyalty and commitments remain respectfully at your service. Contact Us Today For further information, contact us now.
Discount wholesale Plc Controller Led Display - SCP type construction lift platform – Jinyang Detail:

GJJ-SCP type construction lift platform

Jiaxing Jingyang Construction Machinery Co., Ltd. is a newly established joint venture occupying a piece of land of 208 mu. It is an enterprise with new and high technology in the research and development, production, sales and service of construction machinery such as lift platform, all types of construction hoists, and tower cranes. The registered trade mark JINGYANG is one of the most famous brand names of hoist manufacturer over the world as well as a famous brand name in China, and the sales network of its products covers countries and regions in the Europe and America, and in the Southeast Asia.

GJJ-JINGYANG-SCP-platform1

GJJ-JINGYANG-SCP-platform2

GJJ-JINGYANG-SCP-platform3

GJJ-JINGYANG-SCP-platform4

PRODUCT INTRODUCTION

The SCP type construction lifting platform is an aerial work platform designed by our company on the basis of the existing sc type construction elevator. It can replace traditional scaffolding and hanging baskets for building structure construction and exterior wall decoration and decoration construction, which can greatly improve the degree of mechanized construction, construction efficiency, reduce labor intensity, ensure construction safety, and simple operation.

The SCP type construction lifting platform is a lifting machine driven by rack and pinion. It has a very reliable electrical and mechanical safety system. It can rise automatically as the building continues to rise. The platform can be lengthened and shortened as needed. Or widening, it is an indispensable mechanical equipment in construction.

SCP type construction lifting platform, its motor, brake and reducer can use German famous brand NORD products, the main electricity

Gas components and important mechanical components such as bearings and oil seals are all made of European famous brand products. Important steel structural parts are made of high-quality steel at home and abroad. The surface of steel structures such as rail frames is hot-dip galvanized to ensure good corrosion resistance.

GJJ-JINGYANG-SCP-platform5

GJJ-JINGYANG-SCP-platform6

Main applications:

External wall decoratins

External wall cleaning

External wall coating

Construction of glass curtains

SCP160 single column single floor construction lift platform  
Platform length [m] 4.5 ~ 13.5
Platform width [m] 1.2 〜2.2
Max. load [kg] 1600
Standard distance to the wall [m] 3〜6
Max. independent height [m] 7.5
Max. suspension arm [m] 7.5
Standard section specification 076/650X650X1508
Platform section measurements (L*W*H)[m] 1.5X1.2X0.8

GJJ-JINGYANG-SCP-platform7

 

GJJ-JINGYANG-SCP-platform9

GJJ-JINGYANG-SCP-platform10

Applicable:

Construction of main building bodies

External wall decorations

External wall cleaning

External wall coating

Construction of glass curtains

 

Advantages:

High level of mechanization

High efficiency in construction

Lower labor strength

Good safety strength

Good safety performance

Simple operation

Nice appearance

SCP160 single column single floor construction lift platform  
Platform length [m] 4.5 ~ 13.5
Platform width [m] 1.2 〜2.2
Max. load [kg] 1600
Standard distance to the wall [m] 3〜6
Max. independent height [m] 7.5
Max. suspension arm [m] 7.5
Standard section specification 076/650X650X1508
Platform section measurements (长 * 宽 * 高) (L*W*H)[m] 1.5X1.2X0.8

GJJ-JINGYANG-SCP-platform8

GJJ-JINGYANG-SCP-platform11

 

Applicable:

Construction of main building bodies

External wall decorations

External wall cleaning

External wall coating

Construction of glass curtains

 

Advantages:

High level of mechanization

High efficiency in construction

Lower labor strength

Good safety strength

Good safety performance

Simple operation

Nice appearance

Platform length [m] 9〜24
Platform width [m] 1.2 〜2.2
Max. load [kg] 2X1600
Standard sectional distance [m] 7.5 〜13.5
Standard distance to the wall [m] 3〜6
Max. independent height [m] 7.5
Max. suspension arm [m] 7.5
Standard section specification 076/650X650X1508

GJJ-JINGYANG-SCP-platform12

 

Double columns single floor platform

GJJ-JINGYANG-SCP-platform13

 

Application in:

External wall decoration

Extermal wall cleaning

Extermal wall coating

Construction of glass curtains

Platform length [m] 9〜30
Platform width [m] 1.2 〜2.2
Max. load [kg] 2800
Standard sectional distance [m] 7.5 〜16.5
Standard distance to the wall [m] 3 〜6
Max, independent height [m] 7.5
Max. suspension arm [m] 7.5
Standard section specification 076/650X650X1508
Platform section measurements 1.5X 1.2X0.8 (L*W*H)[m]

 

GJJ-JINGYANG-SCP-platform15

 

SCP280 double columns double floors construction lift platform

Applicable in:

Construction of main building bodies

External wall decorations

External wall cleaning

External wall coating

Construction of glass curtains

 

Advantages:

High level of mechanization

High efficiency in construction

Lower labor strength

Gpod safety performance

Simple operation

Nice appearance

Platform length [m] 9〜24
Platform width [m] 1.2 〜2.2
Max. load [kg] 2800
Standard sectional distance [m] 7.5 〜13.5
Standard distance to the wall [m] 3〜6
Max. independent height [m] 7.5
Max. suspension arm [m] 7.5
Standard section specification 076/650X650X1508
Platform section measurements (L*W*H)[m] 1.5X1.2X8

GJJ-JINGYANG-SCP-platform14

GJJ-JINGYANG-SCP-platform16

 

Applicable in:

Construction of main building bodies

External wall decorations

External wall cleaning

External wall coating

Construction of glass curtains

Advantages:

High level of mechanization

High efficiency in construction

Lower labor strength

Good safety performance Simple operation

Nice appearance

Platform length [m] 9〜24
Platform width [m] 1.2 〜2.2
Max. load [kg] 2X2800
Standard sectional distance [m] 7.5 ~ 13.5
Standard distance to the wall [m] 3〜6
Max. independent height [m] 7.5
Max. suspension arm [m] 7.5
Standard section specification 076/650X650X1508
Platform section measurements  (L*W*H)[m] 1.5X1.2X0.8

GJJ-JINGYANG-SCP-platform17

GJJ-JINGYANG-SCP-platform18


Product detail pictures:

Discount wholesale Plc Controller Led Display -
 SCP type construction lift platform – Jinyang detail pictures


Related Product Guide:
Group of Liebherr Cranes Hoists Roof Construction | Gear Rack And Pinion
Pioneer Cover-All Pioneer Updates Rack ‘n Pinion Tarping System in Tarps & Racks | Saj30 For Construction Lifter

owing to excellent assistance, a variety of top of the range items, aggressive costs and efficient delivery, we take pleasure in a very good standing amongst our shoppers. We've been an energetic corporation with wide market for Discount wholesale Plc Controller Led Display - SCP type construction lift platform – Jinyang, The product will supply to all over the world, such as: Sierra Leone , Southampton , Provence , In order to carry out our goal of "customer first and mutual benefit" in the cooperation, we establish a specialist engineering team and a sales team to supply the best service to satisfy our customers' requirements. Welcome you to cooperate with us and join us. We have been your best choice.

We guaranee our product all origional GJJ high quality item, no fake item supply.

  • We have been cooperated with this company for many years, the company always ensure timely delivery ,good quality and correct number, we are good partners.
    5 Stars By Modesty from Dubai - 2016.11.11 11:41
    The sales manager is very patient, we communicated about three days before we decided to cooperate, finally, we are very satisfied with this cooperation!
    5 Stars By Eileen from Thailand - 2016.05.21 12:31
    
    WhatsApp Online Chat !